Overview
Supervise bridge substructure works pile foundations (bored piles, barrettes), pile caps, piers, abutments, and bearing shelves. Supervise bridge superstructure works precast/cast-in-situ girders, segmental box girders, deck slabs, stitch pours, parapets, and crash barriers. Witness post-tensioning operations: duct installation, strand threading, stressing, elongation checks, grouting, and anchor block protection.