Overview
Own end-to-end delivery of production equipment and tooling projects for aircraft and electro-mechanical subsystems: requirements, CAD (Siemens NX), detailed drawings, vendor fab oversight, build, commissioning, and production release. Deliver measurable improvements: drive tooling availability to >95% Uptime, reduce manual assembly cycle time by 20–40% per station, and improve first-pass yield (FPY) on targeted assemblies by >=10% within the first 6–12 months of deployment.