Logistics and Supply Chain · South San Francisco, CA

Production Planner

Zipline · South San Francisco, CA · Posted Aug 5, 2026

This posting comes from Zipline . Confirm the details on their site before applying.

Overview

Own end-to-end production plans for assigned program(s) and work centers: translate weekly/monthly build targets into daily operator schedules, test capacity, and workstation assignments. Be the single owner for ship-date commitments. Maintain and update production master schedule and short-term shop schedules (0–30 days) to hit weekly build targets and minimize schedule slippage.

Responsibilities

  • Own end-to-end production plans for assigned program(s) and work centers: translate weekly/monthly build targets into daily operator schedules, test capacity, and workstation assignments. Be the single owner for ship-date commitments.
  • Maintain and update production master schedule and short-term shop schedules (0–30 days) to hit weekly build targets and minimize schedule slippage.
  • Measure and drive key outcomes: on-time build completion %, first-pass test yield, WIP days, and shortage-resolution SLA. Own recovery plans when metrics fall below target.
  • Align labor to demand: size daily labor rosters, prioritize cross-trained coverage, and trigger overtime or shift adjustments to meet build targets and reduce bottlenecks.
  • Own material readiness: validate PO receipts, inspection queues, kitting, staging, and feeder-stock to ensure <24–48 hour material gap resolution for daily builds. Escalate critical shortages with proposed mitigations.
  • Manage BOM changes and engineering substitutions in production windows with minimal disruption; implement controlled substitutions and workarounds when approved.
  • Coordinate cross-functionally with Manufacturing Engineering, Supply Chain, Quality, Test, and NPI to remove blockers, sequence builds, and implement permanent fixes for recurring failures.
  • Run daily production cadence (standups, dashboard reviews, escalation), maintain planning artifacts (short-interval schedules, shortage logs, recovery plans), and present weekly performance to stakeholders.
  • Drive continuous improvements that reduce WIP days, increase throughput, and shorten recovery time after disruptions; implement measurable countermeasures and validate impact.
  • Own escalation for high-impact failures (tooling down, critical part shortage, test bottleneck) and lead rapid corrective action to protect committed delivery dates.

Requirements

  • 5+ years production planning or manufacturing operations experience supporting NPI and production; direct experience in aerospace, drones, robotics, automotive, or advanced electro-mechanical manufacturing strongly preferred.
  • Demonstrated ownership of production plans for multi-variant products and experience meeting aggressive build-rate targets and recovery SLAs.
  • Track record of owning measurable outcomes: reduced WIP days, improved on-time build %, shortened shortage-resolution time, or increased first-pass yield—provide concrete examples in interview.
  • Deep familiarity with ERP/MRP systems and short-interval planning workflows; experience with MES or digital manufacturing tools is strongly preferred.
  • Able to operate onsite in a factory environment; role requires regular presence at the assigned Zipline facility (on-site daily or per-shift coverage as needed) and occasional early/late shift coordination. Willingness to work occasional weekends or extended shifts during schedule recovery periods.
  • Strong bias for immediate, pragmatic fixes under constrained information—able to make and own trade-offs between quality, schedule, and cost while escalating safety or regulatory risks.
  • Comfortable with high operating tempo, frequent engineering changes, and clear escalation responsibility for production-critical failures.
  • Excellent communication: run daily cadence meetings, drive cross-functional decisions, and present clear recovery plans to leadership.
  • Must be able to work in the country of the listed facility; Zipline can sponsor visas where appropriate.
  • 30 days: Own daily production cadence, stabilize short-interval schedule, and close top 3 active shortage tickets each week.
  • 90 days: Own full weekly master schedule, reduce WIP days by a measurable baseline percentage (target depends on current baseline), and execute at least one recovery plan that returns build-rate to target within the committed window.
  • 180 days: Demonstrate sustained on-time build completion at target rate for assigned program(s), implement one permanent throughput improvement that reduces test or assembly cycle time, and establish clear SLA reporting for shortages and labor coverage.

Benefits

  • Overtime pay

Great fits start here.

Whether you're looking for your next role or your next team member, give people and possibilities a place to meet.